Qualification

Electricians

Material

PosDesignationArticleNumber
0126-pin flat cable, Sub-DT289211
02M3 locking blockT156972
03M3x8-Torx screwB19833852
04GNYE wireL07091
05NameplateT192772

Required material

  • Torx screwdriver size 10

Procedure

ATTENTION!

Working with the unit requires knowledge of the safety instructions and quick guide. That's why:

Read the safety instructions and quick guide carefully before starting any work. The basic requirement for safe work is compliance with all safety instructions and careful action by qualified qualified personnel to prevent accidents involving personal injury and property damage.

Remove covers

  • Unplug the power supply cable from the Gate-6.
  • Hold down both mounting straps and lift the cable cover upwards (Fig.).
  • Remove the top three screws on the back of the Gate-6 (Fig.).
  • Press the side of the housing cover together until you hear a click (Fig.). Then remove the cover.

Retrofitting

  • Remove the blind plug from the ZD opening. This is no longer required.
  • Insert 26-pin flat cable with connector plug from outside into the opening (T28921).
  • Secure the connector by placing the locking blocks on (T15697, B1983385).
    • Also install the grounding cable (L0709) to the mounting screw of the connector.
  • Connect connectors to the GAT-61 control system.
    • 26-pin flat cable → slot X104
    • Grounding cable → slot X150 

Install the cover

  • Put on the housing cover and press on the housing cover from above and from the side until you hear a click.
  • Install 3x mounting screws on the back of the Gate-6.
  • Stick the nameplate (T19277) on the back of the Gate-6 and in the quick guide (O8406-X).

Check function

  • Check communication via the interface in accordance with the procedure in the quick guide.
  • Put on the cable cover and press down until you hear a click.