T29231 ZD interface retrofit
Qualification
Electricians
Material
Pos | Designation | Article | Number |
---|---|---|---|
01 | 26-pin flat cable, Sub-D | T28921 | 1 |
02 | M3 locking block | T15697 | 2 |
03 | M3x8-Torx screw | B1983385 | 2 |
04 | GNYE wire | L0709 | 1 |
05 | Nameplate | T19277 | 2 |
Required material
- Torx screwdriver size 10
Procedure
ATTENTION!
Working with the unit requires knowledge of the safety instructions and quick guide. That's why:
Read the safety instructions and quick guide carefully before starting any work. The basic requirement for safe work is compliance with all safety instructions and careful action by qualified qualified personnel to prevent accidents involving personal injury and property damage.
Remove covers
- Unplug the power supply cable from the Gate-6.
- Hold down both mounting straps and lift the cable cover upwards (Fig.).
- Remove the top three screws on the back of the Gate-6 (Fig.).
- Press the side of the housing cover together until you hear a click (Fig.). Then remove the cover.
Retrofitting
- Remove the blind plug from the ZD opening. This is no longer required.
- Insert 26-pin flat cable with connector plug from outside into the opening (T28921).
- Secure the connector by placing the locking blocks on (T15697, B1983385).
- Also install the grounding cable (L0709) to the mounting screw of the connector.
- Also install the grounding cable (L0709) to the mounting screw of the connector.
- Connect connectors to the GAT-61 control system.
- 26-pin flat cable → slot X104
- Grounding cable → slot X150
Install the cover
- Put on the housing cover and press on the housing cover from above and from the side until you hear a click.
- Install 3x mounting screws on the back of the Gate-6.
- Stick the nameplate (T19277) on the back of the Gate-6 and in the quick guide (O8406-X).
Check function
- Check communication via the interface in accordance with the procedure in the quick guide.
- Put on the cable cover and press down until you hear a click.